![]() |
![]() |
![]() |
![]() |
|
Changing to new Shift Patterns |
Training Seminar: How To Manage Your Shift Pattern The seminar covers everything you need to know to manage holidays and absences. The aim of this seminar is to provide you with the tools and techniques that will be applicable to anyone who manages shifts and would like to improve their methods for dealing with the day-to-day problems associated with working shifts.18th September 2008 20th November 2008 5th March 2009 The Greenaway, Rolleston, Newark, Nottinghamshire, UK Seminar Fee : GBP£350 (+ vat £62.25 if UK based) per person, includes workbook with seminar presentations, lunch and refreshments. Call (+44) 01636 816466 to reserve a place. Training Seminar details |
![]() |
VISUAL ROTA from CDT |
Thoe Old Vicarage, Station Road Rolleston, Nottinghamshire Great Britain. NG23 5SE Tel: 0800 01VROTA (0187682) E-mail: alec@visualrota.co.uk |
Copyright 2007 CDT All rights reserved
The 4th page of Visual Rota gives you the opportunity to cost out the labour element of running your establishment to as exact a figure as you like. This is done by giving a cost to each hour worked. Visual Rota converts all shifts into hours paid, and also into the cost of every persons shift. Each person can be costed separately, or in groups, or totals daily or periodically. Visual Rota has the power to tell management the cost of every employee in as much detail as they would like - immediately. Update a roster and the cost, or saving, is shown immediately.
It is first necessary to determine the cost of employees as an hourly rate. The accuracy of the hourly costs determines the accuracy of the budget and how much it can be controlled or reduced, in pounds or dollars, and this can be as accurate as you like.
All employees incur a direct cost and an indirect cost. The cost elements that go into these direct and indirect costs can be determined by various methods, but the table below shows many of the costs involved - by name. The values given to the costs are for you to determine from your company accounts, but some idea of how to do this is also included below.
This cost is far more difficult to arrive at. The method used to determine each associated cost will usually take the following approach.
For instance, electricity. The cost of this is judged to be proportional to the area of the building and proportional to the hours worked. The relevant data is; electricity costs £10,000pa, staff area ratio 25% of total building area, staff hours total to 100,000hrs/year. This data converts to an hourly rate of 2.5p/hr.
Second instance, employee insurance. The cost of this is judged to be proportional to the number of employees. The relevant data is; cost of insurance £1,000pa, number of employees is 100, Mr Smith works 20hrs/week, Mr Jones works 35hrs/week. This data converts to an hourly rate for Mr Smith 1.0p/hr and Mr Jones 0.55p/hr.
There will always be tiny amounts involved as well as the large amounts such as pay, it is just that there are dozens of the tiny amounts and they all build up. Even if you disregard the sums eventually, the reason why you disregarded them was because you had factual evidence that they were not relevant to your costs.
Visual Rota gives you the power to save on costs by giving you a management tool to experiment with your real work force or to simulate the costs and staffing for an ideal staff/cost ratio. It gives you the power to find out if the oft-mentioned flexibility of having extra staff is worth the extra cost of having unproductive staff, or if there is a cheaper alternative.
In order to use the Budgetary Control feature of Visual Rota, you need to enter three hourly rates for each member of staff. The three rates are as follows:
Rate Purpose
Rate 1 The rate for normal week days
Rate 2 The rate for Saturdays
Rate 3 The rate for Sundays
The full set of images are atVisual Rota Images The links via this picture have been disabled
The three rates are entered down column AS, AT and AU respectively. Each member of staff has three individual rates, which can be calculated as detailed above.
Visual Rota automatically calculates the total cost of employing each member of staff for the roster period. This value is shown in column CI (Column CI is off the picture). Visual Rota also calculates the cost per day, which is shown in row 8. In addition, totals for each default staff zone are shown on Page 4 of Visual Rota, with the total cost of each roster period.
| Large organizations | Total capacity flexibility | Examples | |
| Business plans | Saving Money | Mergers/Acquisitions | More: info1, info2 |
| 3 Case Studies -> | New venture NMEC | Acquisition/expansion | Expanding services |